
TLD Flowline Mips Youth Helmet - Orbit Dark Blue -
The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
SPECIFICATIONS
- 3-Way adjustable screwless visor
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
SPECIFICATIONS
- 3-Way adjustable screwless visor
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
Original: $76.71
-65%$76.71
$26.85Description
The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
SPECIFICATIONS
- 3-Way adjustable screwless visor
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters















